02 / 04 Community Energy Transition

Plan it. Fund it. Build it.

For municipalities: emissions inventories, targets and community energy plans built on the Partners for Climate Protection framework, and the studies and funding applications that turn them into projects.

Axonometric drawing of a typical community: homes, apartments, an arena, a library, shops, industry, roads and a power lineThree sources are marked in orange: homes heated with natural gas, a 1970s arena with an ice plant and gas boilers, and car and truck trips on the main street. Homes heated with gasMost building emissions 1 Arena, 1970sIce plant and gas boilers 2 Car and truck tripsOver a third of emissions 3

Typical community · illustrative

  1. Homes heated with gas. The largest source of building emissions.
  2. Arena, 1970s. Ice plant and gas boilers, owned by the municipality.
  3. Car and truck trips. Over a third of emissions.

01 Where emissions come from

Heat and traffic, mostly.

45%
of emissions in the Greater Toronto and Hamilton Area came from buildings in 2024.
82%
of those building emissions came from burning natural gas, mostly for heat.
37%
came from transportation, the second-largest sector.
+25%
rise in the carbon intensity of Ontario’s grid in 2024, to 73.8 gCO₂e/kWh, as gas generation grew.

Source: The Atmospheric Fund, GTHA Carbon Emissions Inventory, 2024 data, published November 2025.

02 Framework

Five milestones,
one plan.

The Partners for Climate Protection program, run by FCM and ICLEI Canada, gives more than 500 member municipalities a five-milestone framework. We work through each milestone with you, for municipal operations and for the community as a whole.

  1. Milestone 1

    Inventory

    Corporate and community inventories built to the PCP Protocol and the Global Protocol for Community-Scale GHG Inventories: buildings, transportation, waste and more, from utility, fleet and waste data.

    • Corporate inventory
    • Community inventory
    • Business-as-usual forecast
  2. Milestone 2

    Targets

    Targets for municipal operations and for the community, with a science-based carbon budget that shows the remaining allowance year by year.

    • Corporate and community targets
    • Carbon budget
    • Interim milestones
  3. Milestone 3

    Plan

    A community energy and emissions plan: actions modelled for cost and carbon, sequenced into a least-cost pathway and linked to the capital plan, with a climate budget council can use.

    • Community energy and emissions plan
    • Pathway modelling
    • Climate budget
  4. Milestone 4

    Implement

    Retrofit pathway studies for municipal buildings, fleet electrification studies and the funding applications that pay for them.

    • Facility studies
    • Funding applications
    • Procurement support
  5. Milestone 5

    Report

    Annual inventory updates, dashboards for council and the public, and reporting to PCP and under Ontario’s broader public sector energy regulation.

    • Annual update
    • Council dashboard
    • O. Reg. 507/18 reporting

03 Inventories

Every community is different.

Public 2024 inventories for fifteen municipalities in the Greater Toronto and Hamilton Area, compiled by The Atmospheric Fund. Choose one to see where its emissions come from, and how the plan would need to differ.

Public data · The Atmospheric Fund, 2024

Axonometric drawing of a typical community, used as a key to the emission sectorsThe largest source in the selected inventory is highlighted in orange; pointing at a sector highlights it.
Sector key. The largest source is marked; point at a sector to find it.

Peel Region · 2024 inventory

Mississauga

6.71 MtCO₂e in 2024

8.5 tPer resident

788,312Residents

  • Natural gasHeating homes and buildings34%2,305,043 t
  • ElectricityPower for buildings8%537,465 t
  • TransportationCars, trucks and transit37%2,493,007 t
  • IndustryIndustrial processes and fuel17%1,173,376 t
  • WasteLandfill and organics3%200,515 t
  • AgricultureLivestock and fields0%0 t

Buildings are the largest source, at 42%; 81% of building emissions come from natural gas. Transportation adds 37%.

Peel Region · 2024 inventory

Brampton

3.97 MtCO₂e in 2024

5.5 tPer resident

720,807Residents

  • Natural gasHeating homes and buildings36%1,417,042 t
  • ElectricityPower for buildings8%335,340 t
  • TransportationCars, trucks and transit46%1,809,637 t
  • IndustryIndustrial processes and fuel6%219,851 t
  • WasteLandfill and organics5%183,254 t
  • AgricultureLivestock and fields0%6,043 t

Transportation is the largest source, at 46%. Buildings produce 44%, 81% of that from natural gas.

York Region · 2024 inventory

Markham

1.68 MtCO₂e in 2024

4.7 tPer resident

360,123Residents

  • Natural gasHeating homes and buildings40%673,741 t
  • ElectricityPower for buildings10%174,131 t
  • TransportationCars, trucks and transit46%775,223 t
  • IndustryIndustrial processes and fuel0%359 t
  • WasteLandfill and organics3%54,806 t
  • AgricultureLivestock and fields0%6,078 t

Buildings are the largest source, at 50%; 79% of building emissions come from natural gas. Transportation adds 46%.

York Region · 2024 inventory

Vaughan

3.04 MtCO₂e in 2024

8.8 tPer resident

343,739Residents

  • Natural gasHeating homes and buildings31%952,809 t
  • ElectricityPower for buildings9%269,299 t
  • TransportationCars, trucks and transit58%1,746,778 t
  • IndustryIndustrial processes and fuel0%12,825 t
  • WasteLandfill and organics2%51,073 t
  • AgricultureLivestock and fields0%4,161 t

Transportation is the largest source, at 58%. Buildings produce 40%, 78% of that from natural gas.

Halton Region · 2024 inventory

Oakville

1.25 MtCO₂e in 2024

5.5 tPer resident

227,715Residents

  • Natural gasHeating homes and buildings41%510,641 t
  • ElectricityPower for buildings10%125,142 t
  • TransportationCars, trucks and transit40%493,208 t
  • IndustryIndustrial processes and fuel5%61,005 t
  • WasteLandfill and organics4%53,470 t
  • AgricultureLivestock and fields0%2,222 t

Buildings are the largest source, at 51%; 80% of building emissions come from natural gas. Transportation adds 40%.

York Region · 2024 inventory

Richmond Hill

1.09 MtCO₂e in 2024

5.1 tPer resident

214,925Residents

  • Natural gasHeating homes and buildings38%413,660 t
  • ElectricityPower for buildings9%100,561 t
  • TransportationCars, trucks and transit50%541,723 t
  • IndustryIndustrial processes and fuel0%0 t
  • WasteLandfill and organics3%29,893 t
  • AgricultureLivestock and fields0%0 t

Transportation is the largest source, at 50%. Buildings produce 47%, 80% of that from natural gas.

Halton Region · 2024 inventory

Burlington

1.20 MtCO₂e in 2024

6.0 tPer resident

199,153Residents

  • Natural gasHeating homes and buildings39%464,692 t
  • ElectricityPower for buildings9%111,585 t
  • TransportationCars, trucks and transit46%554,799 t
  • IndustryIndustrial processes and fuel2%18,580 t
  • WasteLandfill and organics4%46,764 t
  • AgricultureLivestock and fields0%4,009 t

Buildings are the largest source, at 48%; 81% of building emissions come from natural gas. Transportation adds 46%.

Durham Region · 2024 inventory

Oshawa

1.13 MtCO₂e in 2024

5.9 tPer resident

190,943Residents

  • Natural gasHeating homes and buildings34%385,152 t
  • ElectricityPower for buildings6%71,561 t
  • TransportationCars, trucks and transit47%536,256 t
  • IndustryIndustrial processes and fuel7%82,224 t
  • WasteLandfill and organics5%53,683 t
  • AgricultureLivestock and fields1%5,776 t

Transportation is the largest source, at 47%. Buildings produce 40%, 84% of that from natural gas.

Durham Region · 2024 inventory

Whitby

1.19 MtCO₂e in 2024

7.9 tPer resident

150,789Residents

  • Natural gasHeating homes and buildings38%455,604 t
  • ElectricityPower for buildings6%69,438 t
  • TransportationCars, trucks and transit40%473,042 t
  • IndustryIndustrial processes and fuel13%154,976 t
  • WasteLandfill and organics3%35,257 t
  • AgricultureLivestock and fields0%4,845 t

Buildings are the largest source, at 44%; 87% of building emissions come from natural gas. Transportation adds 40%.

Halton Region · 2024 inventory

Milton

0.91 MtCO₂e in 2024

6.4 tPer resident

141,661Residents

  • Natural gasHeating homes and buildings28%257,362 t
  • ElectricityPower for buildings8%72,002 t
  • TransportationCars, trucks and transit51%462,856 t
  • IndustryIndustrial processes and fuel8%74,605 t
  • WasteLandfill and organics4%33,264 t
  • AgricultureLivestock and fields1%13,214 t

Transportation is the largest source, at 51%. Buildings produce 36%, 78% of that from natural gas.

Durham Region · 2024 inventory

Ajax

0.72 MtCO₂e in 2024

5.2 tPer resident

137,904Residents

  • Natural gasHeating homes and buildings28%204,140 t
  • ElectricityPower for buildings7%51,713 t
  • TransportationCars, trucks and transit60%432,175 t
  • IndustryIndustrial processes and fuel0%0 t
  • WasteLandfill and organics4%32,121 t
  • AgricultureLivestock and fields0%0 t

Transportation is the largest source, at 60%. Buildings produce 36%, 80% of that from natural gas.

Durham Region · 2024 inventory

Clarington

1.48 MtCO₂e in 2024

13.4 tPer resident

110,425Residents

  • Natural gasHeating homes and buildings10%143,065 t
  • ElectricityPower for buildings4%62,103 t
  • TransportationCars, trucks and transit27%406,464 t
  • IndustryIndustrial processes and fuel54%794,668 t
  • WasteLandfill and organics2%27,928 t
  • AgricultureLivestock and fields3%46,794 t

Industry is the largest source, at 54%. Buildings produce 14%, 70% of that from natural gas.

York Region · 2024 inventory

Newmarket

0.45 MtCO₂e in 2024

4.8 tPer resident

93,559Residents

  • Natural gasHeating homes and buildings40%176,965 t
  • ElectricityPower for buildings10%44,809 t
  • TransportationCars, trucks and transit46%207,364 t
  • IndustryIndustrial processes and fuel0%0 t
  • WasteLandfill and organics3%15,643 t
  • AgricultureLivestock and fields1%2,560 t

Buildings are the largest source, at 50%; 80% of building emissions come from natural gas. Transportation adds 46%.

Peel Region · 2024 inventory

Caledon

0.67 MtCO₂e in 2024

8.0 tPer resident

84,085Residents

  • Natural gasHeating homes and buildings25%166,618 t
  • ElectricityPower for buildings7%48,751 t
  • TransportationCars, trucks and transit55%370,133 t
  • IndustryIndustrial processes and fuel0%0 t
  • WasteLandfill and organics3%21,404 t
  • AgricultureLivestock and fields10%64,245 t

Transportation is the largest source, at 55%. Buildings produce 32%, 77% of that from natural gas.

Durham Region · 2024 inventory

Brock

0.11 MtCO₂e in 2024

8.3 tPer resident

13,682Residents

  • Natural gasHeating homes and buildings14%16,109 t
  • ElectricityPower for buildings5%5,938 t
  • TransportationCars, trucks and transit35%39,766 t
  • IndustryIndustrial processes and fuel0%0 t
  • WasteLandfill and organics4%4,220 t
  • AgricultureLivestock and fields42%47,279 t

Agriculture is the largest source, at 42%. Buildings produce 19%, 73% of that from natural gas.

View all fifteen inventories as a table
2024 community emissions by sector, tonnes of CO2e, for selected municipalities in the Greater Toronto and Hamilton Area
MunicipalityRegionResidentsNatural gasElectricityTransportationIndustryWasteAgricultureTotalt per resident
MississaugaPeel788,3122,305,043537,4652,493,0071,173,376200,51506,709,4068.5
BramptonPeel720,8071,417,042335,3401,809,637219,851183,2546,0433,971,1685.5
MarkhamYork360,123673,741174,131775,22335954,8066,0781,684,3384.7
VaughanYork343,739952,809269,2991,746,77812,82551,0734,1613,036,9458.8
OakvilleHalton227,715510,641125,142493,20861,00553,4702,2221,245,6885.5
Richmond HillYork214,925413,660100,561541,723029,89301,085,8375.1
BurlingtonHalton199,153464,692111,585554,79918,58046,7644,0091,200,4306.0
OshawaDurham190,943385,15271,561536,25682,22453,6835,7761,134,6515.9
WhitbyDurham150,789455,60469,438473,042154,97635,2574,8451,193,1627.9
MiltonHalton141,661257,36272,002462,85674,60533,26413,214913,3036.4
AjaxDurham137,904204,14051,713432,175032,1210720,1495.2
ClaringtonDurham110,425143,06562,103406,464794,66827,92846,7941,481,02213.4
NewmarketYork93,559176,96544,809207,364015,6432,560447,3414.8
CaledonPeel84,085166,61848,751370,133021,40464,245671,1518.0
BrockDurham13,68216,1095,93839,76604,22047,279113,3128.3

Tonnes of CO₂e, 2024. Buildings are natural gas plus electricity. Totals are as published; components may differ from them by 1 t because of rounding.

04 Municipal buildings

Start with the buildings you own.

Municipal facilities are among the few emission sources a council controls directly. We benchmark each one against national medians, then build a retrofit pathway for the portfolio: what to fix now, what to replace at end of life, and what each step costs and saves.

  • Facility benchmarking
  • Retrofit pathway studies
  • Links to the capital plan
  • Energy conservation and demand management plans under O. Reg. 507/18, in Ontario

How we plan a building retrofit

MEDIAN SITE ENERGY USE, GJ/m² A YEAR Indoor arena1.65Library1.03Office or town hall0.87K–12 school0.70Pool or rec centre0.68Fire or police station0.66
Canadian national median site energy use by facility type: NRCan, ENERGY STAR Portfolio Manager reference, 2023. Indoor arenas from NRCan’s 2014 arena survey.

05 Funding

Funding we help you pursue.

Offers listed by FCM’s Green Municipal Fund for municipalities. Intake and amounts change, so we confirm current terms before you apply.

As listed in November 2026

Green Municipal Fund offerWhat it fundsSupport
Sustainable Municipal BuildingsRetrofit pathway studyFeasibility studies that plot a pathway to cut energy use and emissions in municipal buildingsGrant of up to 50% of eligible costs: up to $65,000 for one building, $200,000 for several
Sustainable Municipal BuildingsRetrofit capital projectRetrofits of existing municipal buildingsGrant and loan together up to 80% of eligible costs, to $10 million; grant up to 20% of the loan
Community Energy SystemsStudy, business case, capital projectDistrict energy and other community-scale systemsStudy grant up to 50%, to $200,000; business case to $100,000; capital up to 80%, to $10 million
Municipal Fleet ElectrificationStudy, capital projectElectrifying municipal vehiclesStudy grant up to 50%, to $200,000; capital up to 80%, to $10 million
Net-Zero TransformationPlan, study, pilot, capital projectProjects that move a community toward net zeroPlan and study grants up to 50%, to $200,000; pilot to $500,000; capital up to 80%, to $10 million
Home energy financingExpand an existing programScaling a municipal home-retrofit financing program, such as PACELoans up to $10 million, with grants; applications on a rolling basis
Climate-Ready Plans and ProcessesAdaptationClimate adaptation plans and processesUp to $140,000, depending on population

Our municipal services are also summarized in the municipal brochure.

Sources

  1. The Atmospheric Fund, GTHA Carbon Emissions Inventory, 2024 data, published November 2025, including the regional pages for Peel, York, Durham and Halton.
  2. FCM and ICLEI Canada, Partners for Climate Protection: the five-milestone framework.
  3. FCM Green Municipal Fund, funding offers and Sustainable Municipal Buildings, as listed in November 2026.
  4. Natural Resources Canada, Canadian Energy Use Intensity by Property Type, August 2023.
  5. Government of Ontario, O. Reg. 507/18, Broader Public Sector: Energy Reporting and Conservation and Demand Management Plans.

06 Contact

Discuss your community.

Tell us where your municipality is in its plan: a first inventory, a target to set, a plan to fund or progress to report. We’ll reply to arrange a conversation.

Or outline your needs here

What matters most

Opens your email app with these details filled in. Nothing is sent until you press send.

Discuss your community